Factory / Warehouse - PNT3F0026

Property - Overview
Total Building Area
5,600 ㎡Tent warehouse (1,000 square meters on the first floor and 500 square meters on the second floor) for a total of 1,500 square meters. Factory / Warehouse Area : 3,600 ㎡
Office Area : 500 ㎡ Building Type : Detach Land Area
7.68 Rai (12,288 ㎡)
Zone Type General Zone
|
Price
150,000,000 Baht(Approx. 4,500,000 USD) • Total price (included taxes, fee, commission) :
Approx. 159,540,000 Baht Available Date Oct 2025
|
• 1Baht = About 0.030 USD, 1USD = About 33.57 Baht (Refer to Bangkok Bank currency transfer rate on 11 Apr 2025)
• More information about additional cost and condition, please see below.
• Information, price and condition of this property provided and also reserved the rights to change without notice by the property owner. Thai-Koujyo.com can't guarantee any change of that. Buyer or lessor have to confirm the final information, price and condition with the property owner before making any contract.
• Information, price and condition of this property provided and also reserved the rights to change without notice by the property owner. Thai-Koujyo.com can't guarantee any change of that. Buyer or lessor have to confirm the final information, price and condition with the property owner before making any contract.
![]() Secondhand |
![]() |
![]() |
![]() |
![]() |
Last Update || 16 May 2025
4K Drone Gallery
Location
Province
Chonburi
City Zoning
Purple (Industrial and Warehouse)
Common Fee
Factory / Warehouse
General Zone : Included in Rental Fee
Land
General Zone : 1,100 Baht / Rai / Month
Sale Condition
Tax & Fee
Transfer Fee (2%) : Half Pay
Special Business Tax (3.3%) : Half Pay
Withholding Tax (1%) : Half Pay
Special Business Tax (3.3%) : Half Pay
Withholding Tax (1%) : Half Pay
Infrastructure

Floor Loading
Max. Loading : 3 Ton(s) / sq.m.
Clearing Height
Min. Height : 7.5 m.
Electricity
Only electric system and lighting for basic usage. Don't have electric system, transformer, MDB for industrial usage. Require installation if needed.
Water Supply
Only water supply for basic usage. Don't have water system for factory equipments. Require plumbing work and pump installation if needed.
Air Condition System
Factory : Central Air Conditioning (Not require installation)Office : Central Air Conditioning (Not require installation)
Facilities

Security
● Guard House
Fire Protection
● Fire Extinguisher / Fire Hose● Fire Alarm
● Smoke Detector

Parking
● Fix 10 car(s) inside land of factory
Transformer
Have
Crane
Have5t*4

Shutter Door
● Auto