Factory / Warehouse - TP05F0012
Property - Overview
Total Building Area
1,100 ㎡Factory / Warehouse Area : 724.8 ㎡
Office Area : 175.2 ㎡ Other Area : 200 ㎡ Building Dimension : 30X30 m. Building Type : Semi-Detach Land Area
1.89725 Rai (3,035.6 ㎡)Approximate size. Zone Type General Zone
|
Rental
220,000 Baht / Month(Approx. 6,380 USD / Month) Price per ㎡ : 200 Baht / ㎡ / Month (Approx. 6 USD / ㎡ / Month) • May have monthly expenses more than just monthly rent. See information below or ask before make any decision.
Price
40,000,000 Baht(Approx. 1,160,000 USD) Approximate price. • Total price (included taxes, fee, commission) :
Approx. 42,544,000 Baht Available Date Available Now
|
• 1Baht = About 0.029 USD, 1USD = About 34.24 Baht (Refer to Bangkok Bank currency transfer rate on 3 Dec 2024)
• More information about additional cost and condition, please see below.
• Information, price and condition of this property provided and also reserved the rights to change without notice by the property owner. Thai-Koujyo.com can't guarantee any change of that. Buyer or lessor have to confirm the final information, price and condition with the property owner before making any contract.
• Information, price and condition of this property provided and also reserved the rights to change without notice by the property owner. Thai-Koujyo.com can't guarantee any change of that. Buyer or lessor have to confirm the final information, price and condition with the property owner before making any contract.
Secondhand |
Good Access |
Many Interest |
Last Update || 11 Jan 2024
Comment
Small factories suitable for small businesses. Located on main road of project. There is behind of factory have emty area approx 1,400 sq.m. But there is a high-voltage electric pole. Therefore it is not suitable for more constructions. Appropriate to parking area for 15-20 cars. If interested, you can rent or want to buy.
4K Drone Gallery
Location
Province
Samutprakarn
City Zoning
Purple (Industrial and Warehouse)
Common Fee
Factory / Warehouse
General Zone : 3.5 Baht / ㎡ / Month
Rent Condition
Tax & Fee
Property Tax : Excluded (Tenant Pay)
Withholding Tax (5% / Month) : Excluded (Tenant Pay)
Withholding Tax (5% / Month) : Excluded (Tenant Pay)
• In case of rent, tenant have to pay property tax beside the common rental fee.
Minimum Contract Period
3 Year(s)
Contract Deposit
3 Month(s)
Advance Payment
1 Month(s)
Interior Condition
Free Interior Period : 15 Day(s)
Interior Deposit : Need
Interior Deposit : Need
Sale Condition
Tax & Fee
Transfer Fee (2%) : Half Pay
Special Business Tax (3.3%) : Half Pay
Withholding Tax (1%) : Half Pay
Special Business Tax (3.3%) : Half Pay
Withholding Tax (1%) : Half Pay
Payment Condition
- 30% MUST BE PAID UPON THE DATE OF SIGNING THE PURCHASE CONTRACT.
- 70% TO BE PAID AT THE TIME OF TRANSFER OF THE TITLE DEED OF THE LAND.
(TRANSFER OF TITLE DEED DURATION IS WITHIN 45 DAYS)
- 70% TO BE PAID AT THE TIME OF TRANSFER OF THE TITLE DEED OF THE LAND.
(TRANSFER OF TITLE DEED DURATION IS WITHIN 45 DAYS)
Infrastructure
Floor Loading
Max. Loading : 3 Ton(s) / sq.m.Clearing Height
Max. Height : 8 m.Electricity
Second-hand Available (May require installation)Water Supply
Second-hand Available (May require installation)Interior Decoration
Don't have. (Require construction)Telephone System
Don't have wiring, PBX, telephone. Require installation if needed.Internet System
Don't have. Require contract ISP (internet service provider) and installation if needed.Air Condition System
Factory : Don't have. (Self install, if need)Office : Second-hand Available (May require installation)
There is a second-hand air-conditioning system installed in the office, which can be used. There are no air-conditioning facilities in the factory.
Facilities
Security
● Shared Security (Security Gate)Fire Protection
● Fire Extinguisher / Fire HoseParking
● Space for about 15-20 car(s) inside land of factory● Space for about 7 car(s) infront of building
Approximately 7 parking spaces in front of the factory. 15-20 parking spaces in the vacant lot (1,400 m2) behind the factory (if all were used for parking).
Crane
Have5 ton 1 unit / 3 ton 1 unit