THAI-KOUJYO.COM
Thailand, Industrial Estate, database, For Sale, Rent, Factory, Warehouse, Land

Factory / Warehouse - BFZ4F0012

Bangkok Free Trade Zone 4

Property - Overview

Total Building Area
3,007 ㎡
Factory / Warehouse Area : 2,784 ㎡
Office Area : 193 ㎡
Other Area : 30 ㎡
Building Dimension : 96X58 m.
Building Type : Semi-Detach
Zone Type
Free Zone
Rental
571,330 Baht / Month
(Approx. 17,711 USD / Month)
Price per ㎡ : 190 Baht / ㎡ / Month
(Approx. 6 USD / ㎡ / Month)
• May have monthly expenses more than just monthly rent. See information below or ask before make any decision.
Available Date
Oct 2025
The property is currently under construction and scheduled for completion around October 2025.
※ 1 バーツ (Baht)=約4.54円、1円=約0.220バーツ 、 1 バーツ (Baht)=約0.031 USD, 1 USD=約32.13 バーツ
( バンコク銀行レート:14 Aug 2025現在 )
• 1Baht = About 0.031 USD, 1USD = About 32.13 Baht (Refer to Bangkok Bank currency transfer rate on 14 Aug 2025) • More information about additional cost and condition, please see below.
• Information, price and condition of this property provided and also reserved the rights to change without notice by the property owner. Thai-Koujyo.com can't guarantee any change of that. Buyer or lessor have to confirm the final information, price and condition with the property owner before making any contract.
本物件の閲覧数 144 アクセス This property already got 144 views มีผู้เข้าชมอสังหาริมทรัพย์นี้แล้ว 144 ครั้ง

Under Construction

Layout Changeable

Good Access

Many Interest
Last Update || 22 Aug 2025
 

Comment

4K Drone Gallery

 

Location

Province
Chachoengsao
City Zoning
Purple (Industrial and Warehouse)

Common Fee

Factory / Warehouse
Free Zone : None

Rent Condition

Tax & Fee
Property Tax : Excluded (Tenant Pay)
Withholding Tax (5% / Month) : Excluded (Tenant Pay)
• In case of rent, tenant have to pay property tax beside the common rental fee.
Minimum Contract Period
3 Year(s)
Contract Deposit
5 Month(s)
Advance Payment
1 Month(s)
Interior Condition
Free Interior Period : 30 Day(s)
Interior Deposit : Need

Sale Condition

Land Attribute

Infrastructure

Floor Loading

Max. Loading : 3 Ton(s) / sq.m.

Clearing Height

Min. Height : 10 m.

Electricity

Only electric system and lighting for basic usage. Don't have electric system, transformer, MDB for industrial usage. Require installation if needed.
125 amp/Unit

Water Supply

Only water supply for basic usage. Don't have water system for factory equipments. Require plumbing work and pump installation if needed.
3000 L/Unit

Interior Decoration

Don't have. (Require construction)

Telephone System

Don't have wiring, PBX, telephone. Require installation if needed.

Internet System

Don't have. Require contract ISP (internet service provider) and installation if needed.

Air Condition System

Factory : Don't have. (Self install, if need)
Office : Don't have. (Self install, if need)

Facilities

Security

● Shared Security (Security Gate)
● Guard House

Fire Protection

● Fire Extinguisher / Fire Hose
● Fire Sprinkler
● Fire Alarm

Parking

● Fix 10 car(s) inside land of factory

Shutter Door

● Auto

Property Gallery

 

Map / Master Plan / Others

  
 
• Not allow to copy and/or use any information, pictures, videos, maps within this website for your business purpose without granted permission from us. Otherwise, we will take legal proceedings.