Factory / Warehouse - HRR3F0004

Property - Overview
|
Total Building Area
2,848 ㎡Factory / Warehouse Area : 2,560 ㎡
Office Area : 288 ㎡ Building Dimension : 32X80 m. Building Type : Detach Land Area
3.5365 Rai (5,658.4 ㎡)
Zone Type General Zone
|
Rental
569,600 Baht / Month(Approx. 17,658 USD / Month) Price per ㎡ : 200 Baht / ㎡ / Month (Approx. 6 USD / ㎡ / Month) • May have monthly expenses more than just monthly rent. See information below or ask before make any decision.
Available Date Available Now
|
• 1Baht = About 0.031 USD, 1USD = About 32.18 Baht (Refer to Bangkok Bank currency transfer rate on 29 Oct 2025)
• More information about additional cost and condition, please see below.
• Information, price and condition of this property provided and also reserved the rights to change without notice by the property owner. Thai-Koujyo.com can't guarantee any change of that. Buyer or lessor have to confirm the final information, price and condition with the property owner before making any contract.
• Information, price and condition of this property provided and also reserved the rights to change without notice by the property owner. Thai-Koujyo.com can't guarantee any change of that. Buyer or lessor have to confirm the final information, price and condition with the property owner before making any contract.
New Construction |
Last Update || 21 Apr 2026
Comment
Medium-sized factory in like-new condition, with concrete roads surrounding the facility. The factory features an extra-wide main entrance gate, allowing easy access for large vehicles. It is located in WHA Rayong 36 Industrial Estate, which is home to several major EV automotive manufacturing plants. The location offers convenient transportation and is not far from Laem Chabang Port and Map Ta Phut Port.
4K Drone Gallery
Location
Province
Rayong
City Zoning
Purple (Industrial and Warehouse)
Rent Condition
Tax & Fee
Property Tax : Half Pay
Withholding Tax (5% / Month) : Half Pay
Withholding Tax (5% / Month) : Half Pay
• In case of rent, tenant have to pay property tax beside the common rental fee.
Minimum Contract Period
3 Year(s)
Contract Deposit
3 Month(s)
Infrastructure
Floor Loading
Max. Loading : 5 Ton(s) / sq.m.Clearing Height
Max. Height : 7 m.Electricity
Only electric system and lighting for basic usage. Don't have electric system, transformer, MDB for industrial usage. Require installation if needed.Water Supply
Only water supply for basic usage. Don't have water system for factory equipments. Require plumbing work and pump installation if needed.Interior Decoration
Don't have. (Require construction)Telephone System
Don't have wiring, PBX, telephone. Require installation if needed.Internet System
Don't have. Require contract ISP (internet service provider) and installation if needed.Air Condition System
Factory : Don't have. (Self install, if need)Office : Don't have. (Self install, if need)
Facilities
Fire Protection
● Fire Extinguisher / Fire Hose● Fire Alarm
● Smoke Detector


























